Mobile installation platform overall installation instructions and renderings:
1. Due to the large width of the cover on the developing and washing sections, PM personnel have no space to support the PM in the Chamber. It is necessary to install a PM mobile working platform across the Chamber for the developing and washing sections.
2. Due to the different height of Chamber in the developing section/water washing section, it is necessary to install mobile working platforms separately
The overall rendering of the mobile platform skeleton:
1. Support frame is 80*80*2.5T, aluminum profile/mobile guide rail is 40*40*2.5T, aluminum profile
2. The guide rail support frame is SUS304, and the weldment/U-shaped buckle is SUS304
3. Install the limit block above the guide rail
Overall rendering of mobile platform:
1. Install 2 translation wheels/2 guide wheels on the left and right sides
2. Install positioning elbow clips around the mobile platform
3. The main material of the mobile platform is aluminum, and the platform is non-slip aluminum
List of materials for installing the mobile PM operating platform in the DNS development cleaning
Shenzhen Xinyihang Technology Co., Ltd.
Contact: Mr. Ding
Telephone: 13048917302
Email: consin.feng@xinyhtech.com
Company address: Room 302, Building 1, Guole Technology Park, No. 1, Lirong Road, Dalang Street, Longhua District, Shenzhen